Description of the project
– 90 t/h for swine– Exclusive silos for different qualities of the same cereal;
– Transilation in the bran silos to avoid product compaction;
– Fully bolted tubular structures and floors,
– Mills manufactured with raw materials of high resistance without similarity in the market
– Shipment prepared for Line Cleaning Batch
– Dosing system dimensioned to reduce the time lost in the process
– Duplicate flow to ensure capacity and avoid cross contamination